09/10/2013 Mtkvari without Waste Water by 2014
A large scale project – “Clean Mtkvari by 2014” – which is being carried out by GWP for several years, is already in active phase this year.
Fecal waters are reaching Mtkvari through storm water system. In compliance with the Project storm water and drainage (sewage) systems will be separated, absolutely new communications will be installed, old networks will be restored and connected to rehabilitated operating networks.
The project considers connection of separated water drainage system to the collectors located on the right and left banks of Mtkvari river and, eventually, to the main outlet collector. In this way Tbilisi waste waters will be delivered to Gardabani sewage treatment plant and, as the result, we shall have clean river in our capital by 2014.
24/11/2023 Საოპერაციო ცენტრები წყალმომარაგების სერვისების მართვის ევროპული მოდელია - ხოსე მიგელ სანტოსი, gwp-ის გენერალური დირექტორი
24/11/2023 მნიშვნელოვნად გამარტივდება საოპერაციო პროცესები და შეამცირდება ავარიებზე რეაგირების დრო - ზურა ალფაიძე, gwp-ის ტექნიკური განვითარების და სისტემების დირექტორი
24/11/2023 ჯივიპი დიდ დიღომში წყალმომარაგების მაგისტრალურ ქსელზე სარეაბილიტაციო სამუშაოებს ატარებს
22/11/2023 ჯივიპი თბილისის წყალმომარაგებაში ევროპულ სტანდარტს ნერგავს
25/03/2023 Special announcement of Georgian Water and Power Company